Portfolio Briefing
Good afternoon
27 lots can't hand over yet: 50 blocking snags to clear
98 snags open, 11 safety-critical. 13 work orders in progress, 7 overdue. 9 lots settle in the next 60 days, so clear their snags first. 3 asset alerts waiting, 1 critical.
Generated 12:20 PM
Today
Your urgent list, most pressing first
Building X-ray
Every lot in 3D, by readiness
4 buildings
Handover Cockpit
Blockers, settlements at risk
27 lots blocked
Committee Pack
The monthly pack, ready to print
Health 42
Verified Savings
AUDITEDIndependently confirmed financial outcomes
4 verified interventions · $97K in failure costs avoided
Failure cost avoided
$97K
Intervention spend
$20K
Net verified
$77K
Highest-value outcomes
Athena Quays podium terrace waterproofing rectified at subcontractor cost
Post-action inspection
Athena Quays lift door operators recovered from subcontractor
Post-action inspection
No.1 Grant Avenue fire brigade attendance charges recovered
Expert review
Emergency lighting battery renewal bundled across four buildings
Historical comparison
Fleet Overview
By Status
By Risk
1253
Total
100%
Health
4
At Risk
Risk by Location
12 locationsFleet Health Trend & Prediction
Alerts
3Sump pump cycling 4x above design frequency
2 months agoDuty sump pump start count has averaged 212 cycles/day against a design expectation of ~50. Pattern indicates continuous below-grade water ingress rather than pump failure.
Two entrapments in 30 days on a single-lift building
2 months agoLift has stopped between floors twice this month with passengers on board. No redundancy available in this building.
Chlorinator output below specification
2 months agoFree chlorine residual falling below the required range within 6 hours of dosing. Third recurrence in 14 months.
Condenser coil efficiency loss accelerating
2 months agoCondensing approach temperature has risen 6.2K over 9 months, consistent with advanced coil corrosion for asset age.
Balustrade fixing corrosion — safety critical
2 months agoRust staining and measurable bracket movement identified at multiple level 12 balustrade base fixings.
Compressor efficiency below replacement threshold
2 months agoRooftop package unit drawing 18% above nameplate current for delivered capacity at 7 years of age.
Athena Quays — Basement Water Ingress Investigation
urgentAthena Quays — Basement Sump & Stormwater Pumps
Athena Quays — Facade & Balcony Threshold Remediation (Stage 1)
urgentAthena Quays — Facade, Render & Waterproofing
No.1 Grant Ave — Pool Chlorinator & Dosing Skid Replacement
highNo.1 Grant Ave — Pool & Spa Plant
Tower One — Lift Bank Pre-Handover Commissioning & Statutory Registration
highTower One — Passenger Lift Bank (4 lifts)
Tower One — Fire Systems AS 1851 Baseline Certification
urgentTower One — Fire Sprinkler & Hydrant System
Landmark Podium — Lagoon Pool Plant Commissioning
highLagoon Pool — Filtration & Circulation Plant