AssetStack

Recovery Cockpit

Recovery Cockpit

Ranked by how soon the right to recover disappears rather than by how much is owed, because a claim against a lapsed guarantee is worth nothing. Each package assembles into a printable pack with the defect schedule, the evidence count and a drafted letter, ready to send.

Recoverable exposure

$885,400

across 8 subcontractors

Closing within 90 days

$0

0 packages to action

Already unrecoverable

$711,960

3 windows closed

Security held

$2,258,750

$266,980 uncovered

Open exposure 216 days to act

Aqua Systems Pool & Plant

Pool & Hydraulics · Orama — Chevron Island, The Landmark — Tower One · SC-1242

$39,150

covered by security

Open defects

5 (5 overdue)

Retention held

$72,500

Bank guarantee

$0

Liability period

283 days left

0 photos 0 verified site scans 2 resident reports
Open exposure 236 days to act

Meridian Fire Protection

Fire Protection · The Landmark — Tower One, Orama — Chevron Island · SC-1228

$840

covered by security

Open defects

4 (4 overdue)

Retention held

$92,500

Bank guarantee

$0

Liability period

283 days left

0 photos 0 verified site scans 2 resident reports4 blocking handover
Open exposure 266 days to act

Seaview Mechanical (HVAC)

Mechanical · No.1 Grant Avenue — Hope Island, The Landmark — Tower One · SC-1214

$133,450

covered by security

Open defects

5 (5 overdue)

Retention held

$320,000

Bank guarantee

$0

Liability period

283 days left

0 photos 0 verified site scans 3 resident reports5 blocking handover