Maintenance

Maintenance Tasks

12 total tasks β€’ 5 AI recommended

12

Scheduled

0

Overdue

0

Completed

5

AI Recommended

⚠️
urgent
In Progress
AI 92%

Athena Quays β€” Basement Water Ingress Investigation

Trace source of below-grade ingress driving abnormal sump cycling. Dye testing, membrane inspection and core sampling to build the evidence pack for defect claim DL-2026-002.

Athena Quays β€” Basement Sump & Stormwater Pumps
Sep 2, 2026
24h estimated
Unassigned
Est. $9,800
πŸ”
urgent
Scheduled
AI 95%

Orama β€” Balustrade Fixing Structural Inspection (Full Building)

Engineer-certified inspection of every frameless balustrade fixing following corrosion findings. Safety-critical. Feeds evidence into claim DL-2026-009.

Orama β€” Riverfront Facade & Balustrades
Sep 5, 2026
80h estimated
Unassigned
Est. $22,000
πŸ€–
high
Scheduled
AI 84%

Ferry Road Showroom β€” Rooftop Package Unit Assessment

Compressor efficiency and refrigerant analysis on the 7-year rooftop package unit. Determine repair versus replace ahead of summer peak and lease obligation exposure.

Ferry Road Showroom β€” HVAC & Essential Services
Sep 18, 2026
8h estimated
Unassigned
Est. $3,200
πŸ”§
medium
Scheduled
AI 87%

Athena Residences β€” Pool Media Filter First Renewal

Media filter renewal at 5 years β€” first scheduled sinking fund renewal in the portfolio. Establishes the actual renewal interval for pool plant across all buildings.

Athena Residences β€” Pool & Recreation Plant
Nov 10, 2026
20h estimated
Unassigned
Est. $14,500
πŸ”§
medium
Scheduled
AI 90%
CRITICAL

Portfolio β€” Emergency Lighting Battery Renewal Programme

Bulk emergency lighting battery renewal across the Hope Island cluster. Bundling four buildings into one mobilisation to reduce unit cost.

35 Grant Ave β€” Fire Systems & Emergency Lighting
Oct 20, 2026
56h estimated
Unassigned
Est. $19,800
⚠️
urgent
Scheduled

Athena Quays β€” Facade & Balcony Threshold Remediation (Stage 1)

Stage 1 rectification of render cracking and balcony threshold membrane failure, levels 3-6. Coordinate resident access with body corporate. Costs pursued under claim DL-2026-001.

Athena Quays β€” Facade, Render & Waterproofing
Sep 15, 2026
320h estimated
Unassigned
Est. $186,000
πŸ”
urgent
Scheduled
CRITICAL

Tower One β€” Fire Systems AS 1851 Baseline Certification

Baseline AS 1851 certification of sprinkler, hydrant and pump systems. Prerequisite for occupancy certification β€” blocks settlement of all 240 apartments if not complete.

Tower One β€” Fire Sprinkler & Hydrant System
Jan 12, 2027
40h estimated
Unassigned
Est. $18,500
⚠️
high
Scheduled

No.1 Grant Ave β€” Pool Chlorinator & Dosing Skid Replacement

Replace chlorinator cell and dosing skid with correctly sized units for the pool volume. Subcontractor-funded under approved claim DL-2026-003.

No.1 Grant Ave β€” Pool & Spa Plant
Sep 8, 2026
16h estimated
Unassigned
Est. $31,000
πŸ”
high
Scheduled
CRITICAL

Tower One β€” Lift Bank Pre-Handover Commissioning & Statutory Registration

Full commissioning of four high-rise lifts, statutory registered plant lodgement, and 12-month DLP baseline capture including door timing, levelling and ride quality benchmarks.

Tower One β€” Passenger Lift Bank (4 lifts)
Jan 20, 2027
64h estimated
Unassigned
Est. $24,000
πŸ”
high
Scheduled
CRITICAL

Landmark Podium β€” Lagoon Pool Plant Commissioning

Commission lagoon pool filtration, dosing, UV and heat pump array. Establish water chemistry and turnover baselines before resident occupation of the amenity deck.

Lagoon Pool β€” Filtration & Circulation Plant
Mar 10, 2027
48h estimated
Unassigned
Est. $27,000
⚠️
high
Scheduled

No.1 Grant Ave β€” Condenser Coil Replacement (5 units, subcontractor funded)

Replace five corroded condenser coils with coated coils to the original specification. Funded under partially approved claim DL-2026-005.

No.1 Grant Ave β€” Rooftop HVAC & Corridor Ventilation
Sep 25, 2026
60h estimated
Unassigned
Est. $62,000
πŸ”
medium
Scheduled

Hope Island Cluster β€” Pontoon Anode & Fixing Inspection

Cyclic marine inspection of pontoons, gangways, sacrificial anodes and pile fixings across the canal frontage. Anode depletion is the primary maintenance driver.

No.1 Grant Ave β€” Waterfront Pontoons & Marine Structures
Oct 12, 2026
24h estimated
Unassigned
Est. $8,600